Monday, November 25, 2019

Conjugation of Pensar

Conjugation of Pensar Pensar, a verb usually meaning to think, is a prototypical stem-changing verb. The -e- in the stem (pens-) changes to -ie- when stressed, and in all other situations the verb is regularly conjugated. Other verbs following the pattern of pensar include acertar, alentar, apretar, arrendar, atravesar, calentar, cerrar, confesar, despertar, encerrar, enterrar, gobernar, helar, manifestar, merendar, recomendar, reventar, sembrar and sentar. Irregular forms are shown below in boldface. Translations are given as a guide and in real life may vary with context. Infinitive of Pensar pensar (to think) Gerund of Pensar pensando (thinking) Participle of Pensar pensado (thought) Present Indicative of Pensar yo pienso, tà º piensas, usted/à ©l/ella piensa, nosotros/as pensamos, vosotros/as pensis, ustedes/ellos/ellas piensan (I think, you think, he thinks, etc.) Preterite of Pensar yo pensà ©, tà º pensaste, usted/à ©l/ella pensà ³, nosotros/as pensamos, vosotros/as pensasteis, ustedes/ellos/ellas pensaron (I thought, you thought, she thought, etc.) Imperfect Indicative of Pensar yo pensaba, tà º pensabas, usted/à ©l/ella pensaba, nosotros/as pensbamos, vosotros/as pensabais, ustedes/ellos/ellas pensaban (I used to think, you used to think, he used to think, etc.) Future Indicative of Pensar yo pensarà ©, tà º pensars, usted/à ©l/ella pensar, nosotros/as pensaremos, vosotros/as pensarà ©is, ustedes/ellos/ellas pensarn (I will think, you will think, he will think, etc.) Conditional of Pensar yo pensarà ­a, tà º pensarà ­as, usted/à ©l/ella pensarà ­a, nosotros/as pensarà ­amos, vosotros/as pensarà ­ais, ustedes/ellos/ellas pensarà ­an (I would think, you would think, she would think, etc.) Present Subjunctive of Pensar que yo piense, que tà º pienses, que usted/à ©l/ella piense, que nosotros/as pensemos, que vosotros/as pensà ©is, que ustedes/ellos/ellas piensen (that I think, that you think, that she think, etc.) Imperfect Subjunctive of Pensar que yo pensara (pensase), que tà º pensaras (pensases), que usted/à ©l/ella pensara (pensase), que nosotros/as pensramos (penssemos), que vosotros/as pensarais (pensaseis), que ustedes/ellos/ellas pensaran (pensasen) (that I thought, that you thought, that he thought, etc.) Imperative of Pensar piensa tà º, no pienses tà º, piense usted, pensemos nosotros/as, pensad vosotros/as, no pensà ©is vosotros/as, piensen ustedes (think, dont think, think, lets think, etc.) Compound Tenses of Pensar The perfect tenses are made by using the appropriate form of haber and the past participle, pensado. The progressive tenses use estar with the gerund, pensando. Sample Sentences Showing Conjugation of Pensar and Similarly Conjugated Verbs Quien no quiere pensar es un fantico. Quien no puede pensar es un idiota. Quien no osa pensar es un cobarde. (Whoever does not want to think is a fanatic. Whoever cannot think is an idiot. Whoever does not dare to think is a coward. Infinitive.) Aà ºn no he pensado en la cuestià ³n del retiro. (I still havent thought about the question of retirement. Present perfect.)  ¿Cà ³mo calienta un microondas los alimentos? (How does a microwave oven heat up food? Present indicative.) Los padres pensaron que perderà ­an el derecho de vivir en Estados Unidos. (The parents thought they would lose the right to live in the United States. Preterite.) Hasta ahora todos los expertos recomendaban que lo ideal era comer cinco veces al dà ­a. (Until now all the experts recommended that the ideal was to eat five times a day. Imperfect.) Nos manifestaremos hasta tener una solucià ³n. (We will demonstrate until we have a solution. Future.) Mi madre siempre sabe lo que estamos pensando. (My mother always knows what we are thinking. Present progressive.) No pude evitar preguntarme si pensarà ­amos lo mismo doce horas ms tarde. (I couldnt avoid asking myself if we would think the same thing 12 hours later. Conditional.) Los jueces no permitir que gobierne los socialistas. (The judges will not allow the socialists to govern. Present subjunctive.) No sà © lo que ocurrirà ­a si yo pensara como tà º. (I dont know what would happen if I thought like you. Imperfect subjunctive.)  ¡Despierta Amà ©rica! (Wake up, America! Imperative.)

Thursday, November 21, 2019

Homework Assignment Example | Topics and Well Written Essays - 500 words - 20

Homework - Assignment Example 33. Matter on earth is constantly raising where by pressure increases as it is exerted. The geometry axis of the earth is forced to be flat creating a pull that is gravitational. The pull is a continuous one on matter that is on the universe. 34. The law of Harmonies gives a clear connection between the period of the planets and distance of the same planets from the sun. The relationship is that the square of the periods is equal to the cubes of the distance. Having a distance P=10, the period will be identified by making P to be the subject of the formulae. By replacing the distance with 10, the period will be a square root of 1000. 35. By the definition of the universe, the universe is understandable. The feelings experienced o the universe is connected to the harmony. The universe is well understood from the naturally elements are able to move up and down making other substances to be lighter while others are heavy. 36. The moving bodies have nature and destiny thus entail a natural way of lines that are moving. Therefore, there are various circular motions which lead to a corresponding substance during the moving. Moreover, the substances should be qiute perfect and well exalted. Basically, it is the main reason why the stars are perfectly and systematically exalted. 37. With respect to galaxy formation, various masses and forces are experienced during the process. Therefore, in relation to galaxies cluster, the mismatch occurs between the mass of the galaxies and the masses of gravity thus enhancing the masses and forces brought about by the dark matter. 38. Moreover, the experienced process is known as the Big Bang nucleosynthesis. Despite light elements existence, heavier ones in comparison to hydrogen also exist. Therefore, a function of density is created. In addition, there is an involvement of changes in the core of the mantles at the earth. The core fuses hence enhancing the atomic weight increase. 39. The reason

Wednesday, November 20, 2019

Political Campaigns and elections Essay Example | Topics and Well Written Essays - 500 words

Political Campaigns and elections - Essay Example When we think about the ways in which systems for campaigns and elections--including finance and media--seems to work best and ways in which they fall short of an expected level, we are actually thinking about the socio-political fiber of the country and analyze the system in the light of its political history and values. The system for campaigns and elections including finance and media will differ drastically in societies where democracy is newly introduced as a political system and the societies where it has deep rooted political values and mature democratic culture. However, societies that have mature political culture and have a profound democratic history feed for the system wide changes of political campaigns, elections, finance and media that can be adapted with appropriate changes to suit the socio-political environment of a society. Therefore, the best way to think about the political campaigns and election including finance and media is to study the system in grown-up demo cratic societies that have a known and appreciable democratic system in place for decades. With these thoughts in mind, the system for campaigns and elections—including finance and media I would like to prevail is simple in nature.

Monday, November 18, 2019

Financing Options Essay Example | Topics and Well Written Essays - 2250 words

Financing Options - Essay Example 41, No. 3, 2001, pp. 121-140). In this paper, various financial options available in the UK economy for large purchase will be evaluated and the issues associated with such options will also be analysed. Bank loans are considered to be the most reliable source of financing any large purchase. Bank loan is an agreement in which the borrower is provided with full or partial amount of the money required for purchasing certain assets from a large number of commercial banks such as HSBC, Barclays, Standard Chartered and Royal Bank of Scotland as well as cooperative banks such as Tesco Bank, Sainsburys Bank etc. available in the economy. Such sum of money is provided with an agreement of repaying the principle amount after completion of a stipulated period of time. Moreover, the borrower is subjected to pay the fixed or variable amount of interest rate, as applicable, on the principle amount taken as loan (M. Caglayan and A. Rashid, â€Å"The Response Of Firms Leverage To Risk: Evidence From Uk Public Versus Nonpublic Manufacturing Firms†, Economic Inquiry, Volume 5, No. 52,  2013,  pp 341–363). Bank loans can be of secured and unsecured. Unsecured loans are those source of capital in which fund can be quickly availed without any obligation of collateral. Such loan is provided, depending upon the current financial position of the borrower and his reputation in the market. However, in case of large purchases, loan is always made secured by involvement of certain assets such as housing property of the borrower which is used as collateral. The lenders hold the collaterals till the tenure of the loan. If the borrower fails to repay the loan or the interest payment within the stipulated time, the banks are entitled to acquire the right of ownership of the collateral. Secured loan is considered to be the best option for accumulating large amount of money. Mortgage loans are the most prominent example of secured bank loans (I. K. Nassr and G. Wehinger,

Friday, November 15, 2019

The Function Analysis System Technique Construction Essay

The Function Analysis System Technique Construction Essay I have been employed by the University of Salford as a project management consultant. The University is considering constructing a new building call Clifford Whitworth library building 2(CWLB2) This new building will be identical to the existing Clifford Whitworth Library Building (CWLB1) and will be attached to the north end of the conference centre building next to CWLB1 on an existing grassed area. The new Clifford withworth library building will be a mirror image of CWLB1 with regard to its horizontal plan and height dimensions. In this situation, the University is keen to maximise value or eliminating any unnecessary costs on any new building projects when the current economic climate is given. It also wants an environmentally sustainable building which can obtain a high BREEAM rating The picture in above show the current Clifford Whitworth Library existing building and the new proposed library building. Project brief for Task A In this Task, I have to produce a report such as value engineering analysis of the existing CWLB 1 building and identified of functional components of the building with approximate cost breakdown and 80/20 histogram, other than that, I have to analyse the 4 major components such as roof, floor and wall etc. And detail analysis in combined scoring matrix of 1 major component, with explanation and justification of criteria and alternatives. The cost plan show at the below is the cost for Clifford whitworth Library building 1 is  £ 5,417,936.52. In this project, I have use BCIS analysis 21757, 22865 and 21620 to analyze the cost of element or price per meter square for this specification material. In lieu of this I have used external quotations for a number of the elements, and Spons Architectural Price Book 2010 for the balance. The Clifford Whitworth Library building 1 project taken in BCIS which located at Greater Manchester. The cost analysis will therefore need general adjustments for inflation and location factors. Inflation can be dealt with by using a tender price . According to the BCIS for Elemental analysis number 21757 in 2002, the cost per m2 for roof is  £42.43 and the cost is  £12,134, The Tender price value show the proposed project from the BCIS is 182(1Q2002) and the current is 209(4Q2010) .The variation factors are currently 91 for Greater Manchester and 107 for the Berkshire. All these data can be obtained from BCIS. Using the above information, the cost analysis can be adjusted as follows: Updated cost analysis = cost analyisis X current tender price index/regional price tender X Greater Manchester regional index/ Berkshire regional index = 42.43 X 209/182 X 91/107 Revised Cost analysis =  £41.44 x 5381.52 m2 =  £ 223,010.19 Specification for cost plan Clifford Whitworth Library Building 1 Element Specification 1 Substructure PCC driven piles. Concrete pile caps, ground beams and 150mm slab. 2A Frame PCC columns supporting upper floor; steel/timber supporting rafters. 2B Upper floors RC upper floors on permanent formwork. 2C Roof 270m2 mono-pitched metal clad library roof; 69m2 metal clad plywood decking on timber rafters. Langley roofing to entrance (25m2). Aluminium rainwater pipes. 2D Stairs Ditto, basement to second floor 2E External walls Rendered block/block walls; larch Rainscreen cladding; double glazed aluminium curtain walling. 2F Windows and external doors Double glazed powder coated aluminium windows. Oak panelled entrance doors; aluminium louvred doors to plant room. 2G Internal walls and partitions Block and metal stud partitions. PCC walls to lift and stairs; 2No glazed timber lightwells to 1st floor. 2H Internal doors Ash veneered flush doors. 3A Wall finishes Plaster and emulsion; high level acoustic panels. 3B Floor finishes Vinyl sheet, tufted loop pile carpet and non-slip ceramic tile floorings. 3C Ceiling finishes Veneer to underside of roof panels. Plasterboard, timber and other suspended ceilings. 4 Fittings Fittings 5A Sanitary appliances White vitreous china sanitaryware; Doc M pack. 5C Disposal installations Soil and waste pipes. 5D Water installations Hot and cold water services. 5F Space heating and air treatment Gas fired low temperature hot water central heating. Air handling unit and VRV air conditioning. 5G Ventilating systems Extract ventilation to toilets and kitchen. Natural ventilation. 5H Electrical installations Electric light and power. Emergency lighting. 5J Lift and conveyor installations 10-person, 800kg; 3 stops; 0.75m/s; 5K Protective installations Lightning protection. 5L Communications installations Fire detection and alarm. CCTV, data and telephone cables; PA. 5M Special installations Rainwater harvesting; BMS. 5N Builders work in connection Builders work in connection with services. 6A Site works Excavation to reduce levels. Concrete block paviours. 6B Drainage Foul and surface water drainage. 6C External services Gas, water, electricity mains. External lighting. 7 Preliminaries 8% of remainder of Contract Sum (excluding Contingencies). 8 Contingencies 4.41% of remainder of Contract Sum (excluding Preliminaries). Histogram The Histogram for old Clifford Whitworth library building 1 show that the percentage from the element of the total cost of the building, the histogram show that the electrical installation cost the most in Clifford Withworth Library Building, they cost 9.54% of the total cost of the building, they cost  £516,787.37. External walls are ranked second in the chart, they cost 9.33% of the total cost of the building, they cost  £505,432.36. Frame is the third highest in the chart, they cost 9.29% of the total cost of the building. The Fitting and furnishings are the lowest percentage of the Clifford Withworth library building 1, they cost only 0.11% of the 100% of the building, they cost only  £6,027.30, the Disposal Installation are the second lowest in the chart, they cost only 0.20% of the building, last but not least, Gas installation are the third lowest in the chart, they cost approximately 0.21 % The 4 major components i choose is roof, external wall, framce and upper floor. Function Analysis System Technique (F.A.S.T. Diagram) in Roof Aluminium Timber Material Precast concrete Rain Protect the building Heat, sunlight Acquire medium BREEAM rating Sustainably Roof Heat insulation Cold Noise Durability Cost Life Cycle Cost According to the FAST diagram, roof most common material is Aluminium and precast concrete, Steel and timber. Most of the Roof are normally protects against the rain, other than that, the roof also can protect the sunlight or heat and wind, the rating BREEAM for Sustainably will be medium. The insulation of the Roof is they can prevent the heat, cold and the noise. F.A.S.T. Diagram in External wall Roof Support Ceiling Area Protect the building External Wall Acquire high BREEAM Building Sustainably Noise Insulation Durability Cost According to the FAST diagram, External wall use to support the Roof and ceiling, they also can protect the building area when external wall have installed. The rating BREEAM Building for the suitainably is high. They also have a advantages on the insulation, they can prevent the noise and wind F.A.S.T. Diagram in Frame Timber Reinforced concrete material Steel construction Frame Fast Good in fire resistance sustainable design easier navigation maintain According to the FAST diagram, Frame most common material is Timber, Reinforced concrete and steel, frame are very fast in construction process, they are very good in sustainable and last but not least, frame also can make the easier to navigate and the frame also can make it easier to design and maintain your site. F.A.S.T Diagram in upper floor. Timber Reinforced Concrete Material Steel Sound Insulation Upper floor Fast Construction Good in fire resistance Sustainable According to the FAST diagram, Upper floor most common material is timber, reinforced concrete and steel, Upper floor are very good insulation in Sound, the Upper floor are very fast in construction process, they are very good in fire resistance and sustainable. Combined Scoring matrix in the external wall Critiria Combined matrix A Initial Cost A2 B Maintenance Cost A4 B3 A3 C Aesthetics B2 A2 D3 B2 A3 D Insulation properties E2 B3 D2 F2 E Time for construction D2 E2 F Durability G G F E D C B A Exterior wall Alternatives Raw score ( ) ( 2 ) ( 2+2 ) ( 2+2+3 ) (0) (3+2+2+3) (2+4+3++2+3) 2 4 7 0 10 14 Analysis matrix Weight of importance (1-10) 1 3 5 1 7 10 1 Glazed curtain wall 2 3 3 4 1 1 47 2 9 15 4 7 10 3 Metal panel 2 3 3 3 1 2 56 2 9 15 3 7 20 4 Solid concrete block wall 3 2 4 2 4 3 89 3 6 20 2 28 30 According to the combined scoring matrix, we are concerned more on the cost and time instead of design in Clifford Whitworth library building 1, the combined scoring matrix show that which type of the external wall is the best choice for the new proposal building in term of the criteria matrix, In the end, the brick and block wall are the best choice for alternative to proposed the new Clifford whitworth library building with a score of 89 points. Project brief for task 2 In this report, we have to do the new proposal for the 4 components which selected in task 1 to improve the quality and cost of the building to propose the new Clifford Whitworth Library Building with explanation, structure and presentation. The 4 major components to propose the new building is roof, external wall, frame and upper floor. Roof Reinforced concrete are the best choice for the new Clifford Whitworth Library building, they are construct in the similar way as reinforced concrete floors beam and insitu cast concrete slab. Roofs are normally to support the self weight of the roof together with loading from heat, snow and rain, the roof also can prevent the wind pressure as well. The concrete roofs are normally constructed in flat roof, and library has no doubt to construct in flat roof. R.Greeno (2007) stated that The Strength for the reinforced concrete itself has compressive strength. The crushing strength of normal concrete will depend on its composition. The concrete are normally weak in tension, its strength in this respect being only one fourteenth to one eighth of its compressive strength. Wall According to the Combined scoring matrix, solid concrete block wall are the best choice to proposed the new building. A solid concrete block wall is the filled solid with concrete and lightweight concrete blocks. As different to produce a concrete wall where the wall must be created from wood and poured with concrete, then the forms have to be removed, then the concrete block wall can be constructed more fast and easier because of the material construction. The solid concrete block wall have many advantages such as the wall is very solid in sustainable, other than that, they can over a formed and poured concrete wall. When the concrete walls formed, the wooden form built from plywood have been constructed, they are always subject to misalignment, even after they have been squared and leveled, because of the flexible nature of the wood. The solid concrete block walls are good in sound insulation. which means the solid concrete block walls are suitable to construct in the library . the solid concrete block wall are good in fire resistant, which means the building not easily to get burnt. Frame Frame most common material is Timber, Reinforced concrete and steel, but steel framed are the most suitable frame structured for the new building, the designed for steel framed is the connection between the separated member treated as either non-rigid or fully rigid joints. Steel are made under factory conditions are subject to british standards. The strength of a steel frame is controlled and established during manufacture. On fire resistance, steel frame have no doubt with the fire resistance, but the still will get weaker in strength when the temperature hit 299 Celsius above. In construction process, still frame can reduced up to 50% compare to the traditional methods, in this result, steel frame can reduces cost during construction process. Steel frames can live straight, but the timber only can move and warp, twist and shrink during and after construction. This considerably reduces in progress maintenance, as there are less call backs for things like plasterboard cracking or framing popping. Steel framing can span long distances, allowing greater design flexibility. Interior walls can be placed without load-bearing considerations compared to timber framing and other framing. Upper floor Last but not least, Concrete Upper floor is my best options to propose the library because they are good in sound insulation between floor to floor, Concrete Upper floor also good in fire resistant, they can ranging for half and hour to 1 hour depend on the floor type. The concrete upper floor have a good quality, the concrete floor can be act as a thermal store which can reduce in the heating price especially the floor heating systems are used. The precast concrete floor can span longer than timber floor, the precast concrete can small span up to 4.6 m in one- way span. Referencing http://www.ehow.com/about_6522371_advantages-solid-concrete-block-wall.html

Wednesday, November 13, 2019

Ernest Hemingways The Sun Also Rises :: Hemingway Sun Also Rises Essays

THE SUN ALSO RISES The book THE SUN ALSO RISES By ERNEST HEMINGWAY contains 251 pages filled with sadness, devastation and lost love. The plot is based on real people the Hemingway knew and that angered a lot of his friends, if any. Robert Cohn, the main character, is feeling inferior because he is Jewish and starts a boxing career to feel better about himself. He married the first girl he meets out of college. Then, he meets a new woman in CA and then takes her to Europe with him while he is working on his novel. He returns to the U.S. to get it published. His friend, Jake Barnes, who lives in Paris, is asked by Cohn to travel to South America with him to watch bull fights and meet women to "fall in love with". Jake, not interested, stays close to home. "Listen Robert, going to another country doesn't make any difference. I've tried all that. You can't get away from yourself by moving from one place to another. There's nothing to that."(11). However, by staying home, Jake finds trouble. Jake goes to a cafe and meets Georgette, a beautiful woman with an awful smile whom Jake finds boring. Jake takes Georgette to BAL, a dance club and while there, he meets Lady Brett Ashley, the "love of his life" and she is also an alcoholic nymphomaniac. Cohn shows up and also gets infatuated with Brett. However, Brett leave with Jake and Cohn is now extremely jealous, while Georgette is left alone but later leaves with someone. Jake and Brett ride around Paris talking about how they want to be together but can not. Jake goes home later that night, thinks about Brett and ends up crying himself to sleep. "This was Brett that I had felt like crying about. Then I thought of her walking up the street and stepping into the car, as I had last seen her, and of course in a little while I felt like hell again." (34). He wakes up at 4 am to the sound of a drunken Brett arguing with the landlord of Jake's building. She gets up to his apartment but soon leaves and instead, asks Jake to meet her the next day.